The Totally Tommy Building
Tommy's has put together for you a step by step program for building a successful car wash and an easy way for you to launch a turn-key car wash. The Tommy building is now available as a complete package system to help you build a better car wash.

The Totally Tommy Express Wash Facility

Overview:
Tommy Car Wash Systems has now released - The Tommy express wash building package! The Totally Tommy building and express wash system has no franchise fees and best of all no branding fees. You can select colors and the name of the wash to be anything you want! We have created this model to save operators money through the construction process by providing a universal system with the development costs covered by Tommy Car Wash Systems. The contemporary Tommy building design incorporates a 2 lane system with auto pay station and attended pay window, offices and restroom area as well as a unique tunnel setup that incorporates the exclusive Tommy POD System and flight deck labor reducing model. This facility is built as a stand-alone express tunnel with lengths from 80’ to 140’ in 10’ increments.

  • Detailed Scope
  • The Green Factor
  • Build time 30 days
  • Equipment Package Complete
  • Contact us
  • 3D Tour Online!

Totally Tommy Building System Features

• 140’ Long Wash Bay Length
o Building Frames are on 10’ Centers
o Bracing on Sidewall, End walls and Roof as Required By Engineering
o Exposed Structural Connections
o Frames are primed and top coated with enamel paint (choice of color)

• 34’ Wide Building (Nominal Outside Dimension)
o 32’ Inside Dimension

• (2) 10’ Long Full Width Canopies (one on each end)
o Column Covers on Canopy

• 15’ Eave Height on Front Side

• 11’ Eave Height on Back Side
o Unexposed Gutter and Downspouts on Sidewalls
o Exposed Fasteners on Base Plates
o Cast-In Anchor Bolts

• 26’ High Tower, Approximately 26’ Long,10 ft wide with a 6’ Bump Out Projection
o High quality Laminated Panel Construction. with simple joinery / reveals
o Insulated Sidewalls in Tower
o Membrane roof
o Functional Viewing and Cashier Windows

• Tower Build-out includes rough in 10’ x 8’ office, and ADA compliant Restroom
o Internal (approx. 120 sf) Viewing Windows in office and Cashier areas
o (2) Service Doors from Tower to Wash Bay Included
o (2) Internal Doors Included
o Flat Membrane Roof for Tower

• Colorful Structural Steel Construction with Aluminum Window / Wall Technology
o Thermally Broken (Casketed) Glazing System
o Clear Tempered Glass on Sidewalls
o Dark (Black) Glass on Sidewall near Equipment Room
o Insulated Glass is optional

• Exclusive Tommy Pod Concept for Equipment

• Canopy over Cashier Window and Pay Stations
o Non See-through Canopy over Pay Station and Pay Window
o Operable Window in Full Width Panel on Tower
o Double Pay Station Canopy approximately 20’ long by 30’ wide
o Canopy above Window in Tower
o Column Covers on Canopies

• Dynamic and Identifiable Tommy Drive-Through Entry and Exit Doors Frames
o (2) approx. 12’ diameter Anodized or Stainless Drive Through Door Frames
o Aluminum Stainless Framed Entry Doors
o Automated
o (2) Anodized Service Doors (on each end wall)

• Highly Finished Laminated Paneled Tower and End Walls – Choice of Color
o Slanted Sidewall Columns on 10’ Centers
o Cast-in Anchor Bolts, Exposed Connections
o Exposed Connections on Structural Steel
o 5 dozen color options

• Paneled Fascia
o ACM or Laminated Panels on Tower with standard Joinery – Choice of Color
o ACM or Laminated Fascia and End Walls with standard Joinery – Choice of Color

• Full-Length Operable, Painted or Anodized Louvered Vent System for Sidewall
o Vents – optional color selection

• Internal See-Through Mist Wall 20’ long by 12’ high
o Stainless Portal for Vehicles Travel

• Dry Room Area (8’x 30’) for Equipment with 72” Wide Equipment Room Door
o Mirrors (30’ x 5’) on exterior wall in tunnel
o Laminated Panels above and below Mirrors
o Metal Roof on Interior Build-Outs

• Tinted Polycarbonate Roof with anodized / mill finish Aluminum Frame
o “Hooked Roof” with Trusses on 10’ Centers
o Roof mill finish aluminum perlins

• Structural Steel Frame, Primer and Top Coat (Choice of Color)
• Painted or anodized wall frames
• Cross Bracing in Sidewall and Roof as Required by Engineering

• Building Installation Included
o Installation provided by Rough Bros

• (3) Sets of Stamped Engineering Drawings provided
o Additional sets are $300 each

• local civil engineer will need to review and approve prints
o Cost not included

• Tommy site and facility construction manual

• No franchise or Brand fees! – Any name you want!

Contact a Rep for more details on why the Tommy Express Facility should be your next car wash!

Flex Serve Site Model

Gas / C-Store / Wash Model

Totally Tommy Gas - Cstore - Wash Site Plan

 

 


View in High Rez

Express Site Model

Visually appealing from all sides with an open feeling inside.